Construction Change Order Forms

It looks good and works good! Thank you for the fast help! If I need any other documents I will come to you! Happy Labor Day!
Justin G. -- Cutting Edge Design and Construction -- Adams, NE

Six Different Styles To Choose From

Need A Different Layout?

Check out what my partner PDFfiller has available!

No special software is needed (not even Word or PDF) and yet you have absolute, full editing control of the entire document.

I highly recommend PDFfiller- it's easy, it's inexpensive, there's no learning curve, and the capabilities they have waiting for you far outweigh anything I can do with the form here. ~Diane
Any one of these six styles of change order forms will easily cover any and all types of project that you'll be working on.

They're perfect, easy, replaceable, fillinable, etc. and we've used 'em many times on small all the way up to very large projects whenever changes were needed (whether the change was a plus or minus).

Styles #1, #2, and #3 all allow for a license number and expiration date.

Styles #4, #5, and #6 do not require a license number/expiration date.

Plus…
  • Styles #1 and #4 include a section with basic legalese text.

  • Styles #2 and #5 include the same legalese text *plus* the option to charge interest if you wish.

  • Styles #3 and #6 are the same as #1 & #4 except that the legalese section has been left blank so that you can enter your own terms.

Construction Change Order Form Style #1
This change order form, which provides fields for your license # & expiration date, contains basic, standard legalese text.

Preview Change Order

Save $10 - Matching Proposal
$19.95
CHOD-001
Construction Change Order Form Style #2
Provides fields for your company info, your license info, and contains basic, standard legalese text w/ interest.

Preview Change Order

Save $10 - Matching Proposal
$19.95
CHOD-002
Construction Change Order Form Style #3
Provides fields for your license # & exp and has a blank field to enter your own legalese text.

Preview Change Order

Save $10 - Matching Proposal
$19.95
CHOD-003
Construction Change Order Form Style #4
No license required; Same legalese text as the Style #1 change order form.

Preview Change Order

Save $10 - Matching Proposal
$19.95
CHOD-004
Construction Change Order Form Style #5
No license required; Same legalese text as the Style #2 change order form.

Preview Change Order

Save $10 - Matching Proposal
$19.95
CHOD-005
Construction Change Order Form Style #6
No license required; Same blank legalese section as the Style #3 change order form.

Preview Change Order

Save $10 - Matching Proposal.
$19.95
CHOD-006
The information at this link tells you exactly what fields are on the change order form, where those fields are located, and what goes into each of those fields. It's very helpful if you don't want to download a preview copy of the form. :)